Preaload Image

Tariff Details

Utility Start End
NYERI WATER AND SEWERAGE SERVICES (NYEWASCO) 2015/16 2017/18
Block Approved Tariff (Ksh)

Residential Household

0-6 Fixed Charge Ksh.246
7-20 Ksh 58
21-50 Ksh 65
51-100 Ksh 82
100-300 Ksh 86
Above 300 Ksh 91

Commercial/Industrial

0-6 Ksh 62
7-20 Ksh 79
21-50 Ksh 91
51-100 Ksh 103
101-300 Ksh 109
Above 300 Ksh 114

Government Institutions

0-6 Ksh 41
7-20 Ksh 58
21-50 Ksh 65
51-100 Ksh 82
101-300 Ksh 86
Above 300 Ksh 91

Schools and Colleges

0-600 Ksh 41
601-1200 Ksh 46
Above 1200 Ksh 50

Water Kiosks

Per-M3 Fixed Charge Ksh.35

Resale at Water Kiosk

Per-20 Litres Fixed Charge Ksh.2

Bulk water supply

Per-M3 Fixed Charge Ksh.0

Water Bowser(Tanker)

Per-M3 Fixed Charge Ksh.0

Flat Rate (Un-metered)

Per-Month Fixed Charge Ksh.0

Prepaid Meters

Per-M3 Fixed Charge Ksh.0
Sewer Tariff
(i) Sewerage is charged at 100% of the water billed for all customers with sewer connections. Disconnected water accounts shall be charged based on the average of the last three months’ sewer charges before the disconnection. (ii) Customers with no water connection: (a) Individual Domestic Customers, flat rate of KSh. 300 per month. (b) All other customers: 100% of volume of water used as per the metered source of water.

Meter Rent

Size (Inches) Approved Tariff (Ksh)
inch 50
inch 50
1 inch 250
1 inches 250
2 inches 250
2 inches 450
3 inches 450
4 inches 800
4 inches 1500

Water Deposits

Connection Type Approved Tariff (Ksh)
Domestic customer (single dwelling) 1500
Domestic customer (single connection serving more than one single dwelling including flats) consuming more than 200m3 10000
Water Kiosks where anticipated monthly consumption is:
Less than 50m3 1000
Between 50m3 and 100m3 2000
Between 100m3 and 150m3 2500
More than 150m3 3000
Retail shops, workshops and offices consuming more than 10m3 3000
Bar, restaurant and lodgings more than 15m3 5000
Hotel class “A” and “B” less than 150m3 10000
Hotel class “C” and ‘’D’’ more than 150m3 15000
Hospitals more than 150m3 20000
Minor construction site (temporary connection) less than 200m3 10000
Large construction site (temporary connection) more than 200m3 50000
Light industries less than 200m3 10000
Medium industries between 200m3and 300m3 15000
Heavy industries more than 300m3 20000
Health centres/dispensaries less than 150m3 5000
Schools/colleges/other institutions more than 200m3 10000
Schools less than 200m3 5000
Topping up of consumer deposit after disconnection based on actual average consumption for domestic consumers The actual cost subject to a minimum of 2,500

Other Charges

Service Approved Tariff (Ksh)

Penalties

Penalty Description Approved Tariff (Ksh)
Self reconnection after cut off for non payment 5,000 and billing to be backdated from date of cut off
Surcharge for illegal connection-Domestic 10,000 and regularize connection
Surcharge for illegal connection- Commercial/ school/college/ hospital 40,000 and regularize connection
Surcharge for illegal connection-Construction site 100,000 and regularize connection
Surcharge for illegal connection- Industry 500,000 and regularize connection
Illegal connection Sewerage Charges equal to those of illegal connection of water per category
Surcharge for tampering with meters (this to include meter removal, reversing of meter, etc) 5000
Surcharge for direct suction of water from the supply line using a pump 10000
Surcharge for meter loss or damage Cost of meter

Targets for the Tariff Period

Indicator 2015/2016 2016/2017 2017/2018
Water Coverage (%) 91 93 95
Water Quality (%) 100% compliance with the quality standards 100% compliance with the quality standards 100% compliance with the quality standards
Non Revenue Water (%) 20 20 20
Hours of Supply (Hrs) 24 24 24
Metering Ratio (%) 100 100 100
Collection Efficiency (%) 96 96 96
Resale at Kiosk (Ksh/20L) Ksh. 2 per 20 litres Ksh. 2 per 20 litres Ksh. 2 per 20 litres
Staff per 1000 connections 5 5 4
O&M Cost Coverage (%) 103 103 103

Share this